The first step in the design of automated irrigation systems begins with the view and performance of the necessary measurements (availability and access to water source, flow, pressure, etc.) on site by our specialists. After approval of a dendrological project, the project for an automated irrigation system is being prepared.

The project includes:

Detailed design with specification of all necessary components;

  • Details of some of the components;
  • Quantitative value specification of the materials;
  • Offer developed on the basis of the work project.

Prices for preparation of irrigation system technical project:

                                                                                                                                           Area

up to 500 m2

from 500 to 1000 m2

from 1000 to 3000 m2

from 3000 to 5000 m2

 above 5000 м2

Complexity

BGN/m2

BGN/m2

BGN/m2

BGN/m2

BGN/m2

A

BGN 0,50*

BGN 0,40*

BGN 0,30*

BGN 0,20*

negotiable
B

BGN 0,54*

BGN 0,44*

BGN 0,34*

BGN 0,24*

negotiable

C

BGN 0,56* BGN 0,46* BGN 0,36* BGN 0,26*

negotiable

 

* The prices are without VAT

 

Complexity „A“ – an area with regular rectangular forms of green areas, a percentage of shrub-tree vegetation below 10%, paths, pavements and retaining walls below 10% without a pool, water area or other facilities in the yard.

Complexity „B“ – an area with irregular forms of green area, a percentage of shrub-tree vegetation from 10% to 30%, paths, pavements and retaining walls of 10 to 15%, without a pool, water area or other facilities in the yard.

Complexity „C“ – an area with complex shapes of the green area, percentage of shrub-tree vegetation over 30%, trails, pavements and retaining walls over 15%, pool, water area and other facilities in the yard.


THE PROJECT INCLUDES:

  1. Explanatory note;
  2. Design-calculation notes, technical part;
  3. Quality specification of materials and construction works;
  4. 4.Quality-value specification of materials and construction works.

Drawings: 1. Irrigation area / irrigation sectors;

                 2.Planning net / Tubular divorcement (plumbing part);

                 3.Electricity part / cables (if cable management is used).

 

The project is submitted in electronic version or 1 copy / folder (if desired by the customer).

 

Note:

1.Output data: Geodesy, vertical planning, project landscaping. Pads in electronic version with site networks;

2.Period of execution: subject to negotiation.